Following the successful first assignment for a tunnel project in the Westerschelde, the barge De Bever was deployed for dredging works for the Scheldetunnel, part of the Oosterweelverbinding, carried out for the employer Lantis and the TM COTU consortium.
The barge moored on two existing spuds. Vuyk’s Equipment Design department was commissioned to design and engineer a new spud hoist system and to implement related deck and safety updates that enable reliable inland operations.
Space at both spud positions was limited, which set a clear boundary for a compact, maintainable solution with good access for inspection and maintenance. We applied our dredging equipment experience to develop two identical hoist arrangements that used hydraulic clamping. Where practical we reused available components and integrated the system with the barge structure, the excavator setup and the vessel’s services, keeping changes below deck to a minimum. As part of the engineering package we also calculated and verified the stability of the pontoon for the intended operations.
Engineering scope
The scope covered concept development with space claim and technical feasibility, followed by structural verification and detail engineering. We prepared the main arrangement and the construction information for new parts, defined functional loads and materials, and set the operating boundaries for the existing spuds and housings at the intended water depth. The hoisting concept, rigging and principal components were specified in line with industry practice. Service routing and cable management were designed to suit the moving equipment. We added the necessary access for inspection and maintenance and provided clear guidance for hoisting, lowering and upkeep.
In addition to the hoist systems, we designed the sea fastening for the excavator and an end stopper suited to inland use. We updated the general arrangement to include all new elements and revised the safety documentation where needed. Stairs, platforms, railings and any manhole changes were detailed in line with the client’s model and project requirements.
We worked in close alignment with TM COTU to freeze the concept before detailing, managed interfaces with class where required, and phased deliverables toward fabrication and installation. The result is a fit for purpose hoist solution that fit the tight envelope, supported safe and efficient dredging and readied De Bever for the planned excavator operations. With this project we showed that Vuyk has the full capability in house to take on such maritime assignments from concept through installation.