Dynamic Positioning Assessments
Positioning of offshore wind installation vessels is mostly performed by dynamic positioning. Vuyk has programmed its own DP capability tool to assess multiple thruster configurations in specific environmental conditions and taking thruster interaction effects into account.
Our DP capability tools
At Vuyk Engineering, we have developed a sophisticated DP capability tool to enhance the performance and reliability of our offshore wind installation operations. This tool allows us to assess multiple thruster configurations, taking into account specific environmental conditions and thruster interaction effects. By leveraging this advanced technology, we can optimize vessel positioning and ensure efficient and safe operations.
Specialists in DP Capability
In the dynamic and challenging environment of offshore wind operations, advanced DP capability is crucial for the successful positioning of installation vessels. Vuyk’s expertise, combined with our in-house developed DP capability tool, ensures that we deliver reliable and effective solutions for our clients. By prioritizing precision, safety, and efficiency, we help our clients achieve successful offshore wind installations every time.
Scopes of work:
- Assessment of metocean data
- Determination of wind, wave and current loads
- Determination of Dynamic Positioning capability plots, intact as well after component failure
- Optimisation of thruster positions in vessel design or upgrade stages via utilization plots