projects

VERticale: future-proof installation vessel for offshore wind

Image of VERticale: future-proof installation vessel for offshore wind

Foundation installation vessel for future wind farms

VERticale: future-proof installation vessel for offshore wind

Foundation installation vessel for future wind farms

The growth potential for offshore wind energy and the race towards net-zero emissions are major accelerators when it comes to the installation of renewable energy sources. Wind turbines are constantly evolving, and capacities of over 15 megawatts (MW) are likely to be no exception within just five years.

But when wind turbines and capacities are continuously growing, the capacity of current foundation installation vessels may be a limiting factor in the near future. Responding to the demand for larger capacities, Vuyk Engineering Rotterdam presents the new foundation installation vessel (FIV) ‘VERticale’.  

Simpler and safe offshore installation methods

“VERticale is developed for an optimized deck layout”, states Kuno van den Berg, Department Manager Operational Engineering at Vuyk Engineering Rotterdam. “The location of the offshore crane, motion compensated gripper and position of monopiles are all finetuned for efficiency. Compared to other vessels and concepts for future foundation installation, VERticale aims for a minimum number of offshore handling operations. Not only loading and seafastening is done in a controlled port environment, also upending. This results in less motion sensitive operations offshore and therefore lower risk and increased weather window for the actual monopile installation. Thus, operating expenses (OPEX) are reduced”.

The transport layout with vertical positioned monopiles results in a relatively compact vessel of 218 x 70 meters. For monopile or jacket installation, VERticale is outfitted with a 5000 tonnes offshore crane with sufficient lifting height and overturning moment capacity. 

CAPEX minimization    

“The challenge was to find a balance between vessel capabilities for installing future wind turbine generator foundations, with a clear focus on capital expenditure (CAPEX) minimization combined with the same or lower OPEX”, explains Nicky Mayenburg, Technical Sales Manager. “Other solutions and concepts have been studied, but most result in larger vessel dimensions and more complex handling operations when the vessel is offshore. The VERticale setup results in a balanced solution for installing future wind farms”.

Specifications

Launched in
2022
Length
218.00 m
Breadth
70.00 m
Free deck area
10,500 m2
Crane Capacity
5,000 mt @ 50 m outreach
Design
Vuyk Engineering Rotterdam BV

These people can tell you more about this project

Nicky Mayenburg
Nicky Mayenburg

Technical Sales Manager

+31 (0)10 312 6400

sales@vuykrotterdam.com

Need to get in touch with the team?

We are all ears
VUYK engineering