Wind Orca grillages and seafastening

Project Temporary Steel Design Cadeler WindOrca Seafastening and Grillages

Vuyk Engineering designs numerous wind turbine generator (WTG) spreads annually, encompassing tower grillages, bladerack substructures and seafastenings for nacelles, project equipment and lifting tools. These projects typically start with high-level, rapidly evolving concepts and progress toward finalised detailed design drawings.

For Moray West, we executed several seafastening scopes: Cadeler’s Wind Orca is equipped with grillages and seafastenings for the turbine towers, nacelles, bladerack and substructures, transition pieces and several seafastenings for the project equipment.

With years of experience in operational engineering, we’ve been supporting the offshore wind sector from the very beginning.