OWF Temporary Steel Design: from port to installation site

Vuyk Engineering’s Temporary Steel Design team develops blade racks, grillages and seafastenings for offshore transport and OWF installation projects.
 
Large offshore wind components such as blades and towers require dedicated steel structures to be transported and installed under controlled conditions. Blade rack substructures and tower grillages define how loads are introduced into the vessel, how components are restrained during transit and how installation activities can be executed efficiently. Their design governs load transfer and control on board the vessel and directly influences both structural integrity and offshore workability.
 
At Vuyk Engineering, the Temporary Steel Design department focuses on the design of these operation critical structures. The design work is defined by vessel motions, deck interfaces, operational requirements and geometric constraints, with clear load paths from cargo into structure and from structure into vessel. Whether supporting wind turbine blades in blade racks or distributing tower loads through a grillage, the recurring engineering challenge lies in managing forces under offshore conditions while satisfying operational requirements.

OWF Temporary Steel by scope and use

The offshore wind market forms the core of this work. Tight installation windows, heavy components and high vessel utilization place strict demands on both design robustness and execution efficiency. Timme Troost, Manager Temporary Steel Design at Vuyk Engineering, explains: “Vuyk works amongst others for T&I contractors and OEM turbine manufacturers. Contractors are primarily focused on designs that enable fast, repeatable and predictable execution offshore, while turbine manufacturers such as Vestas and Siemens Gamesa define detailed requirements for how their components must be supported, restrained and accessed. Both perspectives impose strict constraints, but from different interests and starting points.”

By understanding these constraints, Vuyk provides engineering packages that balance execution efficiency with component integrity. Design decisions are evaluated based on their impact on accessibility, installation sequence and handling. Improving access to fasteners, simplifying installation steps or adjusting support geometry can save minutes per operation. Over the duration of an offshore installation campaign, these savings accumulate.

“T&I contractors focus on fast and predictable offshore execution, while turbine manufacturers define strict requirements for component support and accessibility. Temporary Steel Design starts with understanding both perspectives and translating them into a workable engineering solution.”

Timme Troost, Manager Temporary Steel Design

Optimisation focused on efficiency, weight and future applicability

Weight optimisation is considered within this broader operational context. As Casper Rensen, Lead Engineer Temporary Steel Design at Vuyk Engineering, explains: “By understanding vessel strength, stability and ballasting behaviour, it can sometimes be beneficial to iterate through design optimisations or introduce local reinforcements at vessel level in order to reduce the weight and complexity of the temporary steel itself.”

Alongside efficiency and weight, clients increasingly consider reusability and future applicability. Where temporary steel was once developed strictly for a single project, newer blade rack substructures and tower grillages are increasingly developed with adaptability in mind. These structures can be reused across projects or adjusted for future component generations, reducing redesign effort while maintaining compliance with component specific requirements.

“Optimising temporary steel does not always start with the steel itself. Understanding vessel strength, stability and ballasting behaviour can open opportunities for a more efficient overall solution.”

Casper Rensen, Lead Engineer Temporary Steel Design

Through detailed consideration of vessel behaviour, component requirements and operational execution, Temporary Steel Design for blade racks and tower grillages supports predictable offshore installation. By combining structural analysis with practical installation insight, Vuyk Engineering delivers steel solutions that align execution efficiency with component protection across offshore wind projects.

Temporary Steel Design Projects

FOWIC: temporary steel solutions for next generation offshore wind

15 MW reusable grillage for Wind Orca and Wind Osprey

Wind Orca grillages and seafastening

FOWIC future-proof bladerack substructure